{
  "schema_version": 1,
  "title": "Supplied-checkpoint continuation: one synthetic project, two observed responses",
  "status": "completed_observation",
  "started_at": "2026-10-02T01:07:32.651348+04:00",
  "finished_at": "2026-10-02T01:07:59.970140+04:00",
  "timezone": "Asia/Dubai (GMT+4)",
  "public_model_label": "Victoria by SentX",
  "independently_verified_underlying_model_version": null,
  "method": {
    "project": "Cedar Shelf Seed Library (invented)",
    "real_customer_data": false,
    "request_count": 2,
    "normal_product_request_path": true,
    "separate_demo_identities": true,
    "separate_sessions": true,
    "checkpoint_explicitly_resupplied": true,
    "second_prompt_includes_exact_first_final_output": true,
    "internal_reasoning_included": false,
    "output_editing": "Final visible text is reproduced exactly as captured; internal reasoning fields and transport metadata are excluded."
  },
  "requests": [
    {
      "number": 1,
      "prompt": "This is a fictional, non-sensitive project-continuity demonstration. Return plain English text using only the supplied project record.\n\nProject: Cedar Shelf Seed Library.\nConfirmed launch date: 14 November 2026.\nConfirmed budget: AED 2,400.\nConfirmed inventory: 60 seed packets.\nCoordinator: Nora (an invented character).\nSource register: S1 is the supplied inventory note dated 1 October 2026 and supports the 60-packet count. S2 is the supplied sponsor note dated 1 October 2026 and supports the AED 2,400 budget.\nUnresolved question: the venue has not yet been confirmed.\n\nCreate a compact handoff checkpoint containing the confirmed facts, decisions, source register, unresolved question and next three practical actions. Clearly distinguish supplied facts from your suggested actions. Preserve the exact dates, amounts and units. Do not imply that suggested actions have been performed.",
      "prompt_sha256": "e532c37a1db4239d9e970bd49d87a457b9bdf18497d63e334f71f2f85fa727bc",
      "requested_at": "2026-10-02T01:07:32.651486+04:00",
      "status": "completed",
      "final_output": "Cedar Shelf Seed Library — Handoff Checkpoint\nDate: 1 October 2026\n\nConfirmed facts (supplied)\n- Launch date: 14 November 2026\n- Budget: AED 2,400\n- Inventory: 60 seed packets\n- Coordinator: Nora\n\nDecisions (supplied)\n- Launch date locked at 14 November 2026.\n- Budget fixed at AED 2,400.\n- Inventory count set at 60 seed packets per S1.\n\nSource register\n- S1 — Inventory note, dated 1 October 2026. Supports the 60-packet count.\n- S2 — Sponsor note, dated 1 October 2026. Supports the AED 2,400 budget.\n\nUnresolved question\n- Venue has not yet been confirmed.\n\nNext three practical actions (suggested, not yet performed)\n1. Confirm a venue for the 14 November 2026 launch and record the decision in the project file.\n2. Assign ownership for finalising the remaining logistics (setup, signage, packet distribution) so each task has a named person before mid-November.\n3. Schedule a short check-in with Nora no later than early November to verify that inventory, budget spend-to-date, and venue status are all on track for launch.",
      "output_sha256": "41541908b6b44348c832d699c8c9b314cfbcddb063e3bb8844a26a7c194bbf51",
      "finish_reason": "stop",
      "elapsed_seconds": 14.343
    },
    {
      "number": 2,
      "prompt": "This is a fresh session for the same fictional, non-sensitive project demonstration. Continue using the checkpoint explicitly pasted below; the test does not rely on recalling another conversation.\n\nNew confirmed updates from the coordinator: a sponsor adds AED 300 to the existing budget, and a newly supplied inventory count is 70 seed packets. The venue is still unconfirmed. Keep the launch date unchanged.\n\nReturn the current project facts, show the budget arithmetic, update the source register with these supplied updates, identify the remaining unresolved question, and give the next three suggested actions. Distinguish supplied facts from suggestions and do not claim any action has already been completed.\n\nSUPPLIED CHECKPOINT:\nCedar Shelf Seed Library — Handoff Checkpoint\nDate: 1 October 2026\n\nConfirmed facts (supplied)\n- Launch date: 14 November 2026\n- Budget: AED 2,400\n- Inventory: 60 seed packets\n- Coordinator: Nora\n\nDecisions (supplied)\n- Launch date locked at 14 November 2026.\n- Budget fixed at AED 2,400.\n- Inventory count set at 60 seed packets per S1.\n\nSource register\n- S1 — Inventory note, dated 1 October 2026. Supports the 60-packet count.\n- S2 — Sponsor note, dated 1 October 2026. Supports the AED 2,400 budget.\n\nUnresolved question\n- Venue has not yet been confirmed.\n\nNext three practical actions (suggested, not yet performed)\n1. Confirm a venue for the 14 November 2026 launch and record the decision in the project file.\n2. Assign ownership for finalising the remaining logistics (setup, signage, packet distribution) so each task has a named person before mid-November.\n3. Schedule a short check-in with Nora no later than early November to verify that inventory, budget spend-to-date, and venue status are all on track for launch.",
      "prompt_sha256": "3c111aa0e8481365a309143a958f71c2cb32f1fa76a27967d993f0b5432392a3",
      "requested_at": "2026-10-02T01:07:46.994949+04:00",
      "status": "completed",
      "final_output": "Cedar Shelf Seed Library — Updated Checkpoint\nDate: 2 October 2026\n\nCurrent project facts (supplied)\n- Launch date: 14 November 2026, unchanged.\n- Budget: AED 2,700 after the sponsor addition.\n- Inventory: 70 seed packets per the newly supplied count.\n- Coordinator: Nora.\n- Venue: still unconfirmed.\n\nBudget arithmetic\n- Previous budget: AED 2,400\n- Sponsor addition: +AED 300\n- New total: AED 2,700\n\nUpdated source register\n- S1 — Inventory note, dated 1 October 2026. Previously supported the 60-packet count; superseded by the new count below.\n- S2 — Sponsor note, dated 1 October 2026. Supported the original AED 2,400 budget.\n- S3 — New inventory count, supplied 2 October 2026. Supports the revised 70-packet count and supersedes S1.\n- S4 — Sponsor update, supplied 2 October 2026. Supports the additional AED 300 and the revised AED 2,700 budget.\n\nRemaining unresolved question\n- The venue for the 14 November 2026 launch has not yet been confirmed. This is the only open item in the current checkpoint.\n\nNext three suggested actions (not yet performed)\n1. Confirm a venue for the 14 November 2026 launch and record the decision in the project file.\n2. Assign ownership for finalising the remaining logistics — setup, signage, and packet distribution — so each task has a named person before mid-November.\n3. Schedule a short check-in with Nora no later than early November to verify that inventory, budget spend-to-date, and venue status are all on track for launch.",
      "output_sha256": "5c0d5402594db15ed23f84e68cb38023ad61e187653acb955d38e2c0f9569b70",
      "finish_reason": "stop",
      "elapsed_seconds": 12.975
    }
  ],
  "bounded_observations": [
    {
      "finding": "The first final response preserved the supplied launch date (14 November 2026), budget (AED 2,400), inventory (60 seed packets), coordinator (Nora), and unconfirmed venue.",
      "scope": "Request 1 final visible response compared with its prompt."
    },
    {
      "finding": "The second final response preserved the launch date and coordinator, updated inventory to 70 seed packets, and showed AED 2,400 + AED 300 = AED 2,700.",
      "scope": "Request 2 final visible response compared with its prompt and the explicitly supplied checkpoint."
    },
    {
      "finding": "The second final response marked the old inventory source as superseded and retained the venue as unconfirmed.",
      "scope": "Request 2 only; the source notes are fictional and were supplied within the prompts."
    },
    {
      "finding": "Both responses marked the next three actions as suggestions and did not claim they had been performed.",
      "scope": "Final visible text only."
    }
  ],
  "limitations_and_corrections": [
    "The first response added a checkpoint header dated 1 October 2026. The prompt dated two source notes to that day but did not supply a checkpoint date. The actual request occurred on 2 October 2026 GMT+4; the added header is an unsupported assumption and should be corrected or labelled as an assumption.",
    "The second response labelled S3 and S4 as supplied 2 October 2026. That matches the request's local calendar date, but the prompt did not explicitly date those source notes. This is an inferred receipt date, not verified source publication metadata.",
    "The first response strengthened the supplied confirmed budget and launch date into fixed and locked decisions. Those stronger descriptions were not explicitly supplied.",
    "This is one synthetic project with two responses, not a benchmark, independent audit, real customer case, or evidence of general model accuracy.",
    "The checkpoint was pasted into the second request in full. This demonstrates continuation from supplied context; it does not test or prove retained cross-session memory.",
    "Separate demo identities and sessions do not establish the product's internal storage, retrieval, or privacy mechanisms.",
    "The model label is the public product label. The underlying model version was not independently verified.",
    "Recorded durations cover this demonstration's request handling only. They are not controlled performance comparisons.",
    "Suggested project actions were not executed. No external documents or source publication dates were independently verified."
  ],
  "review_note": "Prepared by the site operator from captured prompts and final responses. This is first-party evidence, not an independent endorsement."
}
